Which SUNFULL page should an AC/DC charger buyer start from?
Start from the charger type and project scenario. AC wallboxes fit hotels, offices, apartments and long-stay parking. DC fast chargers fit highway, fleet, taxi, CPO and paid public charging sites. If the project needs OCPP, payment, RFID, QR/POS or OEM branding, send those requirements with the RFQ so SUNFULL can quote the correct model and documentation scope.
7kW, 11kW and 22kW wallboxes for destination charging, installers and distributor programs.
AC wallbox manufacturer →60kW, 120kW, 150kW, 180kW and higher-power DC fast chargers for commercial sites.
DC fast charger range →Send country, power, connector, OCPP/payment scope, quantity, OEM needs and timeline.
Send project RFQ →AC and DC EV charger manufacturing for commercial sourcing teams.
SUNFULL is a China-based EV charger manufacturer for importers, distributors, installers and charging network operators. We supply AC wallbox chargers, commercial AC chargers, DC fast chargers, OCPP/CSMS-ready configurations and OEM/ODM charger projects, with BESS or solar support only when the charging site requires it.
AC Charger7kW-22kW wallbox and destination charging
DC Fast Charger60kW-320kW commercial and highway charging
Commercial ProjectsAC/DC charger mix, payment, OCPP and RFQ support
OCPP / CSMSBackend, RFID, QR/POS and operator support
OEM / Private LabelBranding, packaging and batch supply for AC/DC chargers
Core EV Charger Platform, with Storage Categories Behind It
Start with the core EV charger lineup, then compare BESS, V2G and hybrid inverter options for your project or distribution plan.
Best Seller
7kW Wall-Mounted EV Charger
Single-Phase Home EV Charging Station - Type 1/Type 2, OCPP 1.6J, WiFi/4G,
Popular
11kW/22kW Home Wallbox EV Charger
Smart Home EV Charging Station - Type 2, OCPP 1.6J, RFID, LAN/4G, IP54
Hot
60-180kW DC Fast Charger
Dual-Gun DC Fast Charging Station - CCS1/CCS2/CHAdeMO/GB-T, IP54, OCPP 2.0.
Heavy Duty
180-320kW DC Charger for Heavy Trucks
High-Power Distributed EV Charging Station - IP54, CCS2/CHAdeMO/GB-T, 150-1
Best Seller
5kWh LiFePO4 Home Battery
Stackable Residential LiFePO4 Battery - 51.2V, IP65, BMS, Expandable to 15k
Built for Every Charging Scenario

Commercial Parking & Mall
7-22kW AC + 60kW DC mix, OCPP backend, multi-tenant billing.

Highway Supercharger Hub
240-480kW liquid-cooled stations with battery buffer for grid relief.

Solar + Storage + EV Home
Hybrid inverter + LiFePO4 wallbox + 7kW EV charger in one package.

Microgrid for Remote Sites
PV + storage + diesel hybrid for telecom towers, mines, islands.

Bus & Truck Depot Charging
120-360kW DC chargers with smart load management for depots.

Marine V2G Project Planning
Bidirectional charging for ports and electric vessels requires site-specific power, vessel, grid, connector and control-system review.
Project-Specific Hardware, Documentation and Service Planning
Model selection, OEM scope, compliance files, Incoterms, production schedule and after-sales responsibilities are confirmed against the current RFQ.
Review SUNFULL Verification ScopeA Manufacturer You Can Trust
Factory-Controlled Supply
Built by SUNFULL NEW ENERGY with in-house engineering, controlled manufacturing, traceable production records and export-ready documentation.
Model-Specific Documentation
Request the exact CE/IEC file scope for each quoted model. NRS 097 is reviewed separately when a South Africa project includes embedded generation.
Custom OEM/ODM
Branding, labels, packaging, firmware and enclosure requirements are reviewed by model; MOQ and tooling scope are confirmed in the quotation.
RFQ Scope Review
Sales coordination and pre-sales engineering review connect the buyer's site, software, documentation and commercial requirements.
Engineering Records
Continuous innovation across charging modules, BMS, V2G control algorithms, and liquid cooling.
Bidirectional Project Review
V2G and V2H projects are reviewed against the vehicle, charger, CSMS, metering, grid-code and site responsibilities before a model is proposed.
Where Our Products Are Powering Change
Four core markets where regulation, infrastructure investment and SUNFULL's certification footprint converge — with full global coverage on top.
South Africa
Grid constraints and load-shedding make transformer capacity, staged charger rollout and optional BESS buffering important procurement inputs.
- CCS2 / Type 2 and OCPP options by project
- Site tariff and payment model confirmed by operator
- Key cities: Johannesburg, Cape Town, Durban
Pakistan
Utility policy, tariff treatment and grid reliability can change project economics; buyers should confirm current local rules before sizing solar, storage and charging equipment.
- Inverter and battery sizing based on measured loads
- Utility and importer requirements confirmed locally
- Key cities: Karachi, Lahore, Islamabad
Germany
AFIR procurement requires buyers to coordinate charger hardware with ad-hoc payment, price display, operator data, accessibility and site responsibilities.
- Model-specific CE/IEC files and payment integration scope
- EPC procurement channel supported
- Key cities: Berlin, Munich, Hamburg
Netherlands
Bidirectional charging projects require vehicle, charger, CSMS, grid-code, metering and operator responsibilities to be tested as one system.
- ISO 15118 scope confirmed by model and vehicle
- Marine V2G planning reference available
- Key cities: Rotterdam, Amsterdam, Utrecht
From Inquiry to Order Release — A 6-Step Process
Milestone-based review from RFQ inputs through configuration approval, inspection, logistics and support scope.
Inquiry & Spec
Submit site, vehicle, power, connector, software, quantity and destination details so the correct datasheet, price basis, MOQ and schedule can be confirmed.
Sample / Pilot
Confirm sample availability, sample MOQ, test plan and remote commissioning scope for the selected model.
Contract & PI
Confirm the contract entity, Incoterm, payment terms, inspection responsibility and deliverables in the pro-forma invoice.
Production & QC
Freeze the approved configuration, then confirm production schedule, quality records and any buyer or third-party inspection.
Logistics
Confirm freight mode, packing, insurance, customs responsibility, destination charges and tracking against the agreed Incoterm.
After-Sales
Confirm model-specific warranty, spare-parts recommendation, remote diagnostics, firmware and on-site responsibility in the quotation.
International B2B Supply With Project-Specific Review.
SUNFULL shipments and project support for buyers in Europe, Africa, the Americas, Asia-Pacific and the Middle East.
Assembly, Testing and Export Packing Workflow
Use the factory images as a starting point, then request order-specific inspection and release records for the selected charger model.
Questions Buyers Should Separate Before RFQ
Product documentation, site approval and operator obligations are related but not interchangeable.
EU AFIR Project Scope
AFIR is not a standalone charger certificate. Review payment, price display, OCPP, data, accessibility and operator responsibilities with the hardware.
Read the official EU regulationSouth Africa NRS Scope
NRS 097-2-1 concerns embedded-generation grid interfaces. It may matter when a charging site includes grid-connected solar or storage, not as a general charger certificate.
Review the grid-interconnection documentOCPP and CSMS Scope
Protocol version alone does not prove backend compatibility. Confirm the target CSMS, security profile, charger functions and interoperability test plan.
Use the OCPP supplier checklistCommon Questions From Buyers
What is your MOQ and lead time?+
Which certifications come standard?+
Do you support OCPP for backend integration?+
What payment terms do you accept?+
What is your warranty & after-sales policy?+
Can you OEM with our brand and custom firmware?+
Company Certificates and Model-Specific Product Files
ISO certificates identify the company management scope. Product marks, reports and protocol support must be verified against the quoted model.
What Buyers Can Verify Before an Order
Model Documentation
Request the exact datasheet, declaration and available test-file scope for the quoted charger, inverter or storage configuration.
Factory and Quality Records
Review production scope, inspection checkpoints, serial-number control, packing requirements and pre-shipment evidence for the order.
Project Delivery Scope
Confirm site inputs, connector and protocol options, firmware version, commissioning responsibilities, spare parts and after-sales response path.
These sectors describe the applications supported by the product range. Any customer-specific reference is shared only when evidence is available and disclosure is authorized.
Request a Project-Specific Quote
Tell us about the site, vehicle, software, quantity and destination so the quotation can confirm:
- Detailed product spec sheet (datasheet PDF)
- FOB price + sea/air freight estimate
- Lead time & MOQ
- Requested compliance files and local approval scope
- Sample / pilot project terms
- OEM / ODM consultation if needed
WhatsApp: +86 181 3572 0426
Email: info@sfxntech.com
Request a Quote
All fields marked with * are required.